AE INDEXEstimate my project
Home / By suburb / What a renovation costs in Brunswick
AE INDEX
Melbourne Renovation Cost Index
Renovation costs
Brunswick 3056

What a renovation
costs in Brunswick

Brunswick is the most mixed housing stock of any inner-north suburb — Victorian terraces on the Sydney Road side, solid interwar brick through the middle, and converted industrial buildings scattered between them. What you own matters more here than where you live, and the cost spread reflects that.

Indicative ranges

Rear extension
$330k – $445k

45 m², mid finish, one new wet area, constrained access

Second storey
$460k – $625k

55 m², mid finish, one new wet area, stair and structural work

Full renovation
$590k – $800k

120 m² internal, mid finish, new kitchen and bathroom

Rates: Archicentre Australia CostGuide 2026 · GST inclusive
Site adjustments for Brunswick conditions: AE Index

What drives cost here

Solid brick, not weatherboard

Much of Brunswick is double brick or brick veneer rather than timber. That is good news on restumping and bad news on structural change — every new opening needs steel, engineering and propping.

Deep, narrow allotments

The classic Brunswick block runs long and thin. There is usually room to extend rearward, but getting a truck down the side is another matter, and hand-carrying materials the length of the block adds real labour.

Former industrial land

Pockets around the old factory sites carry contamination history and fill of unknown quality. Site investigation is cheap; discovering it after excavation starts is not.

Merri-bek heritage precincts

Overlays cluster along the older streets rather than blanketing the suburb. Two houses on the same street can face genuinely different approval paths — check yours rather than assuming.

Estimate your own project

Two minutes, no phone call

Brunswick is already selected. Answer eight questions and you will see an indicative range, the full calculation behind it, and what to ask any builder quoting the job.

Typical Brunswick projects

ProjectWhy it costs what it doesRange
Rear extension to a double-fronted brick houseRemoving the rear wall of a load-bearing brick house means steel and engineering before anything new goes up.$330k – $445k
Second storey over solid brickExisting footings often carry the load better than timber stock, but roof removal and weather protection run longer.$460k – $625k
Warehouse or shopfront conversionHighly variable. Change of use, fire separation and acoustic requirements can dominate the budget.Assessed individually
Kitchen onlyBelow our minimum — referred to a single trade.$25k – $50k
Minimum project size. AE Index works on structural renovations and extensions from $150,000. Smaller jobs and single-trade work are referred on rather than quoted.

Common questions

Why is a brick house more expensive to extend than a weatherboard one?

Not always — but structural change is. Opening up a load-bearing brick wall requires steel, an engineer's design, and temporary propping while it goes in. A timber-framed house is far cheaper to cut into, though it usually needs more work underneath it.

My block backs onto a laneway. Does that help?

Considerably. Rear laneway access can remove most of the access premium from a quote, because materials and machinery reach the work directly. It is one of the few site features that genuinely reduces cost, and it is worth telling any builder about early.

What is not in these numbers?

Landscaping and external works, appliances, furniture and window furnishings, council planning application fees, driveway reinstatement, and anything discovered once walls are opened. Design fees, engineering, the building surveyor, the permit levy and the energy assessment are included.

Should I be worried about contamination on a former industrial site?

Worth checking rather than worrying. A soil report early in the process costs a fraction of what a mid-excavation discovery does, and it lets a builder price the job properly instead of loading the quote with contingency.

When you are ready to build

AE Index is not a building company. When a project is ready to be priced properly, we pass it to a builder from our verified network — who will walk the site, inspect what is under the floor, and put a fixed price in writing. We are paid a fee by them on work that proceeds, and you are under no obligation to use them.

Plenty of directories call their builders trusted without saying what that means. Ours means five specific things:

  • Current domestic builder registration, confirmed with the Victorian Building Authority
  • Domestic building insurance current and sighted
  • Two completed projects contacted directly — not supplied testimonials
  • Fixed-price contracts with a written variations policy
  • Re-checked annually, and removed from the network on any lapse

The sensible order is estimate first, referral second. Run the numbers, decide whether the project is viable, and only then talk to a builder.

Last updated 28 July 2026

AE Index publishes indicative cost data for Melbourne residential renovation. Estimates are budget-setting figures, not quotes, and assume a standard site with no undisclosed structural, drainage or contamination issues. Square-metre rates are drawn from the Archicentre Australia CostGuide 2026, an independently published Australian cost guide, and are GST inclusive. Site adjustments are AE Index's own and are labelled wherever they appear. AE Index refers projects to a builder from its verified network and receives a fee on work that proceeds.